Based on the needs of engineering and the present research of deep foundation pit,this paper works out a FFM program which concerns with soil elasto-viscoplatic model and influence of stress history. A set of excavation case in different condition is calculated and analyzed. It shows that the different time of excavation and intermission will distinguish the results. By comparing the calculation with site inspection,time-dependent regularity is established.