节点文献
应用综合评判法预测外界干扰因素对工期的影响
Aplly a Synthetical Judging Method to Calculate All Kinds of Outside Disruptiones Which Are Interfere with Time Limit for a Project
【摘要】 本文应用模糊数学的综合评判方法,预测外界干扰因素对建筑工程施工工期的影响。
【Abstract】 The paper aplly a synthetical judging methodof the dimnessmathematicsto calculate all kinds of outside disruptiones whichare interfere with time limit for a project.
【关键词】 建筑工程;
工期;
模糊数学;
综合评判法;
【Key words】 building engineering; time limit for a project; dimnessmathematics; synthetical judging method;
【Key words】 building engineering; time limit for a project; dimnessmathematics; synthetical judging method;
- 【文献出处】 丹东纺专学报 ,Dandong Textile College , 编辑部邮箱 ,2001年04期
- 【分类号】TU722
- 【被引频次】2
- 【下载频次】49