厦门海沧大桥西塔塔柱施工技术
Construction technology of Haicang bridge’s west tower column
【摘要】 国内外悬索桥索塔施工的技术基本上是以翻转模板工艺为主 ,但每次浇筑 6m的翻转模板还没有先例 .笔者以厦门海沧大桥西塔塔柱施工为例 ,介绍每次浇筑 6m的翻转模板施工的新技术 .
【Abstract】 The construction technology of suspension bridge at home and abroad is mainly technology of 6m turn over shuttering each time. This paper takes Haicang bridges west tower column as an example and introduces new technology of casting 6m turn over shuttering.
【关键词】 施工;
技术;
悬索桥;
塔柱;
翻转模板;
【Key words】 construction; technology; suspension bridge; tower column; turn over shuttering;