节点文献

广州新白云机场冲孔桩施工难题及技术措施

Construction difficulties of cast-in-situ pile in percussion drilled hole in new Guangzhou Baiyun airport project and technical countermeasures

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 赵文兵王光政

【Author】 ZHAO Wen bing,et al. (Mechanical Execution Company, China Construction Eighth Engineering Bureau, Nanjing 210014,China)

【机构】 中建八局机械化施工公司!南京210014

【摘要】 针对新白云机场冲孔桩施工中出现的泥浆问题、卡锤、塌孔、偏孔和断桩难题,提出了一系列技术措施,使这些问题得到了彻底解决,为华南地区岩溶地层的桩基施工提供了有益的借鉴

【Abstract】 In accordance with the difficulties encountered during the pile construction of the new Guangzhou Baiyun airport project such as the slurry problem, hammer blocking , caving, alignment and pile segmentation, this paper puts forward a series of techmical countermeasures which have thoroughly resolved those difficulties, and therefore offers a good example for the pile construction in karst formation of South China.

  • 【文献出处】 长春工程学院学报(自然科学版) ,Journal of Changchun Institute of Technology , 编辑部邮箱 ,2001年03期
  • 【分类号】TU753.3
  • 【下载频次】41
节点文献中: 

本文链接的文献网络图示:

本文的引文网络