节点文献

程潮铁矿2~#主溜井加固工程稳定性数值分析

Stability in Reinforcement on No.2 Main Ore-Pass of Chengchao Iron Mine by Numerical Simulation

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 宋卫东; 郭寥武;

【Author】 SONG Weidong, GUO Liaowu (Resources Engineering School, UST Beijing, Beijing100083, China; Chengchao Iron Mine, Ezhou 436051, China)

【机构】 北京科技大学资源工程学院!北京100083; 武钢程潮铁矿!鄂州436051;

【摘要】 针对程潮铁矿2~#主溜井“托斗法”加固方案,采用数值模拟计算的方法,在加固前后条 件下,对围岩的力学状态、局部结构和系统整体结构的稳定性进行了预测分析,为整体加固设 计方案的评价提供了理论依据.

【Abstract】 According to the reinforcement plan on No.2 main ore-pass of Cheqchao iron mine by the method of support funnel, it is analyzed by numerical simulation that is the stability in the mechanical state of surrounding rock and the local and whole structure before and behind reinforcement, The calculation result presents the theoretical basis for the choice and confirmation of the whole reinforcement plan.

【基金】 冶金局九五重点攻关项目
  • 【文献出处】 北京科技大学学报 ,Journal of University of Science and Technology Beijing , 编辑部邮箱 ,2001年03期
  • 【分类号】TD352
  • 【被引频次】19
  • 【下载频次】118
节点文献中: 

本文链接的文献网络图示:

本文的引文网络