节点文献
大型铸件强制冷却的工艺设计
Structure of Forced Cooling System & Design of Its Auxiliary Device
【摘要】 以工艺设计的具体要求为前提,进行了强制冷却系统及其相关工装的设计,并介绍了相应的思路和具体方法。其中包括冷却壁厚度的计算、强制冷却体系的结构等等。其应用表明计算和设计是合理的。
【Abstract】 Forced cooling system and design its auxiliary device based on concrete requirements of process design have been introduced with relevant ideas and concrete methods including calculation of forced cooling wall thickness, structure of system etc. which has been proved to he rational by application.
- 【文献出处】 中国铸造装备与技术 ,CHINA FOUNDRY MACHINERY & TECHNOLOGY , 编辑部邮箱 ,2000年04期
- 【分类号】TG24
- 【被引频次】6
- 【下载频次】123