节点文献
同顺序流水作业排序问题的一个启发式算法
A Heuristic Algorithm for Flow-Shop Scheduling Problem
【摘要】 本文主要给出了同顺序m×n排序问题初始序的选取方法以及通过计算可避免出现高重循环的初始序的排序算法,然后又给出了利用矩阵可行线性质将初始序调试成较优序的可行方法.利用该文方法对n=15,m= 3~14的144个例题计算,得出平均相对误差为 3.145%的结果,对于m= 3与m= 4的 128个例题计算,得出平均相对误差为 0.6306%.统计结果表明该方法可在实际中进行应用.
【Abstract】 This paper present a new heurstic algorithm for m × n Flow-Shop scheduling problem. In this algorithm, there is no mutiple cycle for an initial sequence. We give also a method which can change the initial sequence to a better one by using the characters of the feasible line of the matrix. Examples with n = 15, m = 3 - 14 show that the relativ error in average is 3.145%. And examples with n = 15, m = 3 and m = 14 show that the relative error in average is 0.63%. Statistic results show that this method can be applied effectively in practice.
- 【文献出处】 应用数学与计算数学学报 ,Communication On Applied Mathematics and Computation , 编辑部邮箱 ,2000年02期
- 【分类号】O223
- 【被引频次】2
- 【下载频次】138