节点文献
汾河二库倒垂孔施工方案的选择比较
Selection of Construction Alternatives for Pendulum Shaft in Fenhe Reservoir Ⅱ
【摘要】 根据汾河二库实际情况 ,对倒垂孔的施工方案进行选择比较
【Abstract】 The construction of pendulum shaft is a project inserted in that of the main dam project.In this paper,three construction alternatives of the pendulum shaft in Fenhe Reservoir Ⅱ are compared according to the construction schedule of the main dam project,to the construction cost of the pendulum shaft and to the equipment and technology level there are of constructor.
- 【文献出处】 山西水利科技 ,SHANXI HYDROTECHNICS , 编辑部邮箱 ,2000年S1期
- 【分类号】TV5
- 【下载频次】17