白石水库前期准备工程投资控制

Investment Control of the Primary Preparation Works of Baishi Reservoir Project

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 杨晓波高素丽张恒珍王义才

【Author】 Yang Xiaobo Gao Suli Zhang Hengzhen Wang Yicai (Bureau of Baishi Reservoir Construction and Administration of Liaoning Province,Beipiao City,122115)

【机构】 辽宁省白石水库建设管理局!北票市122115

【摘要】 辽宁省白石水库前期准备工程概算总投资 172 44万元 .为做好投资控制工作 ,建立了完善的投资控制体系 ,严格审核各承包商月验工计价 .采取了合理分标、优化设计、加强合同管理等投资控制措施 ,从而实现在各项前期准备工程满足设计要求和使用条件下 ,节省工程投资 915万元 ,使前期准备工程投资控制取得成功

【Abstract】 The estimated investment of primary preparation works of Baishi Reservoir in Liaoning Province is 172.44 million Yuan。To control the investment well, the prefect system was set up。The pricing of monthly work checking of contractors was examined and verified strictly. Some measures for controlling investment, including dividing bids, optimizing designs and strengthening contract management, etc., were taken. There fore, under the condition that all primary preparation works meet the design requirements and use conditions, the project investment of 9.15 million Yuan were saved, and the aim of investment control has been achieved。

  • 【文献出处】 水利水电技术 ,WATER RESOURCES AND HYDROPOWER ENGINEERING , 编辑部邮箱 ,2000年05期