节点文献

寒地污水处理厂大型无粘结预应力沉淀池施工

Construction of Large Unbonded Prestressed Deposition Pond of Waste Water Processing Factory in Cold Area

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 孙莉李世斌李建华郝吉全

【Author】 SUN Li 1, LI Shi bin 2, LI Jian hua 2, HAO Ji quan 2 (1.Heilongjiang Mudanjiang Project Quality Supervision Station, Mudanjiang, Heilongjiang 157000,China; 2.No.4 Sub company, Mudanjiang No.6 Construction Company, Mudanjiang, Heilongjiang 1570

【机构】 黑龙江省牡丹江市工程质量监督站!黑龙江牡丹江157000牡丹江市第六建筑工程公司四分公司!黑龙江牡丹江157011

【摘要】 牡丹江市污水处理厂直径 45 m的二次沉淀池 ,施工中底板采用设置加强带取代后浇带 ,保证了混凝土连续浇注的质量 ;同时还应用了环形无粘结预应力钢筋张拉技术。

【Abstract】 In construction of the second deposition pond, whose diameter is 45m, of Mudanjiang Waste Water Processing Factory, strengthening zones was adopted in the bottom board to substitute late grouting zones to ensure the quality of continuously grouted concrete. The ring unbonded prestressed reinforcements tension technique was also used at the same time.

  • 【文献出处】 施工技术 ,Construction Technology , 编辑部邮箱 ,2000年12期
  • 【下载频次】41
节点文献中: 

本文链接的文献网络图示:

本文的引文网络