节点文献
底板最大突水量预测
Prediction of maximal quantity of water-inrush from floor
【摘要】 以断层或陷落柱为通道的底板突水 ,在最大突水量时 ,突水通道内壁具有达到最光滑程度的特征 ,据此建立了最大突水量计算的圆形光滑管道模型 .根据流体力学理论 ,推导出采场底板最大突水量预测的非线性公式 ,揭示矿山压力对最大突水量的非线性影响 ,并用实例了说明该公式的可应用性 .
【Abstract】 The passage of water*.inrush from floor has the characteristic of maximal smoothness in inner wall when the passage is a fault or a subsided*.column and the water*.inrush quantity gets maximum.The model of round and smooth tube is built to calculate the maximal water inrush quantity.On the basis of the theory of flow mechanics,the non*.liner formula for predicting the maximal quantity of water*.inrush from floor is induced,which shows the non*.liner influence of underground pressure to maximal quantity of water*.inrush.The applicability of the formula is tested by an example.
- 【文献出处】 焦作工学院学报(自然科学版) ,JOURNAL OF JIAOZUO INSTITUTE OF TECHNOLOGY , 编辑部邮箱 ,2000年06期
- 【分类号】TD74
- 【被引频次】12
- 【下载频次】198