节点文献

新城金矿-175m中段1763采场采矿方法改进

The improvement of mining method in stope 176 of level -175m in Xincheng Gold Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘多文王立君刘益福高洪利刘明波岳发强

【Author】 Liu Duowen et al. (Xincheng Gold Mine of Shandong Gold Group Ltd.Co.)

【机构】 山东黄金集团有限公司!新城金矿

【摘要】 介绍新城金矿 -1 75m中段 1 763采场采矿方法改进过程。应用盘区机械化上向水平分层尾砂胶结充填采矿法 ,回采该采场的三分层、四分层 ,将采矿损失率降至4 4 %,取得了较好的经济效益。

【Abstract】 The process of the improvement of mining method in stope 176 of level -175m in Xincheng Gold Mine was introduced.Using panel mechanization,the rd and 4th slices of stope 176 were mined by method of upward horizontal slicing and consolidated fill with tailing.By this mining method ,the ore loss rate of mining reduced to 4.4%,gaining better economic benefit.

  • 【分类号】TD863
  • 【下载频次】85
节点文献中: 

本文链接的文献网络图示:

本文的引文网络