节点文献

施工期混凝土拱坝应力实测数据的混合模型研究

Study on Hybrid Model of Stress Observation Data of Concrete Arch Dam under Construction

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 吴子平王振波宋修广

【Author】 WU Zi ping 1, WANG Zhen bo 2, SONG Xiu guang 2(1. College of Water Conservancy and Hydropower Engineering, Hohai Univ., Nanjing 210098, China; 2. College of Civil Engineering, Hohai Univ., Nanjing 210098, China)

【机构】 河海大学水利水电工程学院!江苏南京210098河海大学土木工程学院!江苏南京210098

【摘要】 论述了施工期大坝观测数据混合模型.应用三维有限元方法对坝体结构进行分析计算,综合考虑了坝体在施工过程中水压、温度、时效及浇筑高度、封拱灌浆高度、混凝土水化热对坝体的影响.结合湖北省熊渡重力拱坝实例,建立了熊渡拱坝的混合模型.更加合理地解释、评价大坝工作性态,为大坝安全监控提供了依据

【Abstract】 In this paper, a hybrid model is presented based on the observation data collected during the construction period of a large dam. The Xiongdu Arch Dam in Hubei province is analyzed by means of the three dimensional finite element method, considering the effects of such factors as water pressure, temperature, time effect, constructed height, grouting stage, and cement hydration heat in the construction period. The results from the model provide a reasonable basis for the explanation and evaluation of the behavior of the large dam and for the realization of the monitoring of dam safety.

  • 【文献出处】 河海大学学报(自然科学版) ,JOURNAL OF HOHAI UNIVERSITY , 编辑部邮箱 ,2000年01期
  • 【分类号】TV698
  • 【被引频次】7
  • 【下载频次】136
节点文献中: 

本文链接的文献网络图示:

本文的引文网络