多跨连续板桥桥面混凝土的浇筑要点

Important points of deck concrete casting of continuous plate girder

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 于玲平; 浦玉炳;

【Author】 YU Ling ping 1, PU Yu bing 2 (1.Bureau of Public Roads of Huaibei, Huaibei 235000, China; 2.Survey and Design Institute of Harbour and Waterway of Anhui Province, Hefei 230011, China)

【机构】 淮北市公路管理局!安徽淮北235000; 安徽省港航勘测设计院!安徽合肥230011;

【摘要】 采用满堂支架进行多跨连续板桥梁的施工 ,桥面板混凝土的浇筑、梁板位移量的确定以及预拱度的设置是决定工程质量的关键因素 ,为了确保工程的施工质量 ,文章提出了施工期采用预压荷载消除支架的非弹性变形和连续一次浇筑大体积梁板混凝土的技术保障措施 ,经实践证明 ,这些方法是有效和合理的。

【Abstract】 In the construction of continuous plat girder on flsaework,the deck casting,the calculation of beam deviation and the precast arch setting are the main factors determining the quality of the technology.During the period of construction, pre compressive load is used to compete the falsework’s non elastic deformity and continuous casting of the whole huge concrete is made. The methods are valid and reasonable in pratice.

  • 【文献出处】 合肥工业大学学报(自然科学版) ,Journal of Hefei University of Technology(Natural Science) , 编辑部邮箱 ,2000年S1期
  • 【分类号】U445
  • 【下载频次】47
节点文献中: 

本文链接的文献网络图示:

本文的引文网络