节点文献
黄河下游堤防道路硬化工程设计方案的研究
Research on the designing plan of the yellow river’s lower reaches embankments’ road hardening project
【摘要】 为使黄河堤防在硬化后能更好地满足防汛抢险车辆通行的需要 ,根据黄河堤防道路的现状和特殊的运用条件 ,针对堤防道路路线小转弯半径、路面结构及排水等问题提出了切合实际的设计方案 .
【Abstract】 In order to meet the requirements of vehicles used for the flood controlling. According to the present states and the special using conditions of the embankments of the Yellow River, the paper aims at such questions as small turning radius, the structure of the road surface and the drainage system etc. and gives out practical designing plans.
【关键词】 堤顶路面;
硬化;
设计;
黄河下游;
【Key words】 road on the bank; hardening; design; Yellow River’s lower reaches;
【Key words】 road on the bank; hardening; design; Yellow River’s lower reaches;
- 【文献出处】 华北水利水电学院学报 ,Journal of North China Institute of Water Conservancy and Hydroelectric Power , 编辑部邮箱 ,2000年04期
- 【分类号】U412
- 【被引频次】1
- 【下载频次】62