清江水布垭水电站地下厂房岩体质量评价及反馈设计研究

QUALITY ASSESSMENT OF ROCK MASS AND FEEDBACK DESIGN FOR UNDERGROUND BUILDINGS OF SHUIBUYA HYDROPOWER PLANT

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 徐卫亚谢守益蒋晗徐瑞春李会忠邵建富

【Author】 XU Wei-ya ① XIE Shou-yi ① JIANG Han ① XU Rui-cun ② LI Hui-zhong ② SHAO Jian-fu ③ (① Faculty of Civil Engineering, Hehai University, Nanjing 210098) (② Integrated Prospecting Bureau of Changjiang Water Conservancy Committee, Yichang 443003

【机构】 河海大学土木工程学院!南京210098长江水利委员会!宜昌443003法国里尔科技大学!法国里尔59655

【摘要】 考虑地下水 ,地应力及结构面产状和岩溶、剪切带发育的特点修正 ,确定了水布垭水电站地下工程洞室工程岩体质量 ,进行了地下工程的 RMR分类研究 ,讨论了与水布垭地下工程反馈设计及信息法施工的有关问题。

【Abstract】 A large Shuibuya hydropower plant will be constructed on the very complicated geological condition. There is a challenge appearing in design and construction of the project. Considering the results of detailed geological exploration, a quality assessment of rock mass for underground buildings of the hydropower plant is carried out. The authors describe the engineering rock mass quality for underground opening as follow: Q und-r=90+3 *R c+250 *K v-100(K 1 +K 2+K 3). The result of RMR for quality assessment of rock mass for underground building of Shuibuya hydropower plant project are illustrated. At last the progressive feedback design and informative construction related to the underground working is presented.

【基金】 国家电力公司重大项目! (SPKJ0 16 -0 2 )
  • 【文献出处】 工程地质学报 ,JOURNAL OF ENGINEERING GEOLOGY , 编辑部邮箱 ,2000年02期
  • 【分类号】TU452
  • 【被引频次】25
  • 【下载频次】292