节点文献
广州丫髻沙大桥转体工艺设计构思的特色和探讨
A probe into the design conception of rotary construction of Yajisha Bridge in Guangzhou
【摘要】 广州丫髻沙大桥采用先竖转后平转的两次转体施工方案 ,竖转重量 2 0 58t,平转重量13685t.本文对丫髻沙大桥转体施工设计的特色进行分析和探讨
【Abstract】 Yajisha Bridge in Guangzhou was constructed by two-step rotary method including upright rotation followed by plane rotation. The weight of upright rotation was 2?058?t and that of plane rotation was 13?685?t.The features of design conception of rotary construction of Yajisha Bridge in Guangzhou was introduced and discussed in the paper.
【关键词】 钢管;
混凝土;
拱桥;
转体施工;
广州;
【Key words】 steel tube; concrete; arch bridge; rotary construction; Guangzhou;
【Key words】 steel tube; concrete; arch bridge; rotary construction; Guangzhou;
- 【文献出处】 福州大学学报(自然科学版) ,JOURNAL OF FUZHOU UNIVERSITY(NATURAL SCIENCES EDTION) , 编辑部邮箱 ,2000年04期
- 【分类号】U448.22
- 【被引频次】17
- 【下载频次】221