节点文献
预制砼与现浇砼工地结合试验研究
The Experimental Study of Combination of Precast Concrete and Concrete Casted on Spot
【摘要】 国内某正在建设中的公铁两用大桥上层公路桥采用砼桥面系与桁梁结合梁 ,砼桥面板是预制的 ,而与钢桁梁结合处砼是现浇的 .为了确定新、老砼结合面上的剪切强度和抗拉强度 ,完成了无钉、有钉共 1 6个组合件的预制砼与现浇砼工地结合试验及结果分析 .该成果已应用于该桥结合梁的后续研究
【Abstract】 In order to determine the shear and pull strength on the combination surface of the newly casted concrete and the precasted concrete for a certain bridge composite girders,the experimnets on the combination of precast concrete and concrete casted on spot are carried,including 16 specimen.The results are analyzed and some conclusions are drawn.The results lay foundation for the successive study of the bridge composite girders.
【关键词】 桁梁结合梁;
砼桥面系;
抗剪强度;
抗拉强度;
【Key words】 truss compostite girder; concrete slab; shear strength; pull strength;
【Key words】 truss compostite girder; concrete slab; shear strength; pull strength;
【基金】 铁道部重点项目!( 96G-3 5 -N)
- 【文献出处】 长沙铁道学院学报 ,JOURNAL OF CHANGSHA RAILWAY UNIVERSITY , 编辑部邮箱 ,2000年02期
- 【分类号】U448.216
- 【被引频次】5
- 【下载频次】67