大型电站锅炉设计与运行中防止炉内结渣的措施
Slagging Preventive Measures in Design and Operation of Large Utility Boilers
【摘要】 在收集了大量国内外300MW及以上大型电站锅炉的有关资料,分析研究了现代大型燃煤电站锅炉的设计特点,并在参考各运行电厂在实践中总结经验的基础上,仅就防止炉膛结渣的问题,总结了现代电站锅炉在设计与运行中应采取的措施。
【Abstract】 On the basis of:collecting large amount of the relerant materials of utility boilers with capacity of 300 MW and above at home and abroad, analyzing and studying the design features of large size modern coal fired boilers and consulting the practical experience of various existing plants, the measures, which should be adopted in the design and operation of modern utility boilers, are summed up interms of preventing furnace from slagging.