节点文献

柘溪水电站引水隧洞衬砌在温度和使用荷载下的计算分析

Calculation analysis of diversion tunnel lining of Zhexi Hgdropower Station under temperature and serrice Load

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘幸李发旭周祖俊陈波方梅陈震

【Author】 LIU Xing\+1,LI Fa xu\+2,ZHOU Zu jun\+2, CHEN Bo\+1,FANG Mei\+1, CHEN Zhen\+1 (College of Civil and Architectural Engineering, Wuhan Univ. of hgdr. & Elec. Eng., Wuhan 430072, China; 2.Zhexi Hydropower Station, Anhua 413500 China)

【机构】 武汉水利电力大学土木与建筑学院!湖北武汉430072柘溪水电站!湖南安化413500

【摘要】 采用钢筋混凝土非线性有限元方法,对湖南柘溪水电站引水隧洞衬砌在温度变化和使用荷载作用下的受力情况进行了计算分析,得出了温度变化是引起衬砌开裂的原因和衬砌结构仍具有较高承载力的结论.

【Abstract】 By using nonlinear finite element method of reinforced concrete, the paper carries out a calculation and analysis for reinforced concrete lining structure of diversion tunnel at Zhexi Hydropower Station under temperature and service load, and obtains a conclusion that the temperature difference is the main factor caused the lining cracking and the structure is basically in safety.

【关键词】 非线性有限元法温度应力
【Key words】 finite element methodnonlineartemperature stress
  • 【文献出处】 武汉水利电力大学学报 ,JOURNAL OF WUHAN UNIVERSITY OF HYDRAULIC AND ELECTRIC ENGINEERING , 编辑部邮箱 ,1999年05期
  • 【分类号】TV732
  • 【被引频次】6
  • 【下载频次】86
节点文献中: 

本文链接的文献网络图示:

本文的引文网络