柘溪水电站引水隧洞衬砌在温度和使用荷载下的计算分析
Calculation analysis of diversion tunnel lining of Zhexi Hgdropower Station under temperature and serrice Load
【摘要】 采用钢筋混凝土非线性有限元方法,对湖南柘溪水电站引水隧洞衬砌在温度变化和使用荷载作用下的受力情况进行了计算分析,得出了温度变化是引起衬砌开裂的原因和衬砌结构仍具有较高承载力的结论.
【Abstract】 By using nonlinear finite element method of reinforced concrete, the paper carries out a calculation and analysis for reinforced concrete lining structure of diversion tunnel at Zhexi Hydropower Station under temperature and service load, and obtains a conclusion that the temperature difference is the main factor caused the lining cracking and the structure is basically in safety.
- 【文献出处】 武汉水利电力大学学报 ,JOURNAL OF WUHAN UNIVERSITY OF HYDRAULIC AND ELECTRIC ENGINEERING , 编辑部邮箱 ,1999年05期
- 【分类号】TV732
- 【被引频次】6
- 【下载频次】86