无粘结预应力混凝土平板开洞技术

Holing Technique of the Prestress without Bond Concrete Flat Slab

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张玉明常万鹏张然赵谦

【Author】 Zhang Yuming\ Chang Wanpeng\ Zhang Ran\ Zhao Qian

【机构】 北京市建筑工程研究院

【摘要】 北京花乡工农业产品展销厅工程由于使用高度的要求,要对原1、2 层门厅双向无粘结预应力混凝土顶板沿四周梁边全部剔除,开洞8m ×7.45m 。本文从板底支撑系统的搭设、分段进行混凝土板剔除、预应力筋切断、放张、张拉端面加固处理、重新张拉等方面详细阐述了开洞的方法。

【Abstract】 In the project of Beijing Flower Village Industrial and Agricultural Product Exhibition and Sale Hall, due to the requirement of height, the two way prestress without bond concrete top slab of the entrance hall has to be rejected entirely along the beams all around on the primary first and second floors, with a 8m×7 45m hole. This paper details the holing method on the aspects of erecting of the plate bottom bracing system, rejecting of the concrete slab in sections, the cutting and relaxing of the prestressed reinforcement, treatment of tension end surface strengthening and restretching.

  • 【文献出处】 施工技术 ,CONSTRUCTION TECHNOLOGY , 编辑部邮箱 ,1999年12期
  • 【分类号】TU757
  • 【被引频次】5
  • 【下载频次】52
节点文献中: 

本文链接的文献网络图示:

本文的引文网络