广州市解放大桥钻孔灌注桩施工工艺探讨

CONSTRUCTION PROCESS OF BORED AND CAST INPLACE PILES OF JIEFANG BRIDGE IN GUANGZHOU

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 朱志刚

【Author】 Zhu Zhigang (Traffic Construction Company of Down Town Area,Guangzhou 510000)

【机构】 广州市中心区交通建设公司!广州510000

【摘要】 探讨广州市解放大桥钻孔灌注桩施工工艺,着重阐述各主要工序如测量、机械设备、固定钢平台及其搭设、钢护筒制作与安装、钻机成孔、钢笼制作与安装、清孔、导管、漏斗、剪球、水下混凝土配制及浇注等施工工艺。经本工程的实践,对跨江大桥的水下桩施工总结出一套较成熟、可操作性较强的施工工艺经验。

【Abstract】 The construction process of Bored and Castinplace piles of Jiefang Bridge in Guangzhou is discussed,and the key techniques are introduced and stressed such as measuring,mechanical equipment, fixing and setting of steel platform making and installation of steel casing,holes drilling,steel cages,holes clearing,conduct,hopper,shear ball,underwater concrete mixing and casting,etc..Through practice of building such a big bridge,a set of technological experience has been summarized which is mature and easy to operate in constructing underwater piles of overriver bridges.

  • 【文献出处】 地质灾害与环境保护 ,JOURNAL OF GEOLOGICAL HAZARDS AND ENVIRONMENT PRESERVATION , 编辑部邮箱 ,1999年03期
  • 【分类号】U443.154
  • 【被引频次】2
  • 【下载频次】42
节点文献中: 

本文链接的文献网络图示:

本文的引文网络