复杂地质条件下混凝土灌注护坡桩施工质量的控制

CONSTRUCTION QUALITY CONTROL OF CAST-IN-PLACE SLOPE PROTECTION PILES WITH PUMPING CONCRETE IN BUILDING WASTE BACKFILL

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 弓泽宇张浩博寇佳亮杨福生陈发贵雷雨

【Author】 GONG Ze-yu;ZHANG Hao-bo;KOU Jia-liang;YANG Fu-sheng;CHEN Fa-gui;LEI Yu;Shaanxi Construction Industry Petrochina Company Limited;School of Civil engineering&Architecture, Xi’an, University of Technology;

【机构】 陕西建工集团有限公司西安理工大学土木建筑工程学院

【摘要】 混凝土灌注桩因其施工效率高、成桩质量好、无污染、成本低等优点在建筑工程中得到了广泛的应用。但在地下成桩的施工过程中,不同的地质环境会严重影响成桩质量,因此有必要探讨在复杂地质环境下对护坡桩施工质量控制。以锦业时代C区·D5大道项目基坑支护工程为例,探究因建筑垃圾回填所致的地层复杂引起的混凝土灌注护坡桩施工问题、相应的处理方案、施工工艺、施工流程及质量控制。以及在施工过程中遇到的新的问题及相关处理措施等方面进行了详细的论述。结果显示项目部人员经讨论后所采用的施工方案可有效解决因建筑垃圾回填所致的地层环境复杂引起混凝土灌注桩施工难度增加这一难题,且保证了所成混凝土护坡柱的质量。因此本项目中分析问题思路处理方案和具体处理措施等对同类工程具有一定的参考价值。

【Abstract】 Cast-in-place piles with pumping concrete have been widely used in construction engineering because of their high construction efficiency, excellent quality, no pollution, and low cost. However, in the construction process of underground piling, different geological environments will seriously affect the quality of piling, so it is necessary to explore the quality control of slope protection pile construction in complex geological environment. Taking the deep foundation pit engineering of Jinye Times Area C · D5 Avenue project as an example, this paper explored the related construction processes, problems, corresponding solutions and its processes, and quality control of piles with pumping concrete under the complex ground condition caused by building waste backfill. Additionally, the new problems encountered in the construction processes and the related solving measures are discussed in detail. The results showed that the construction scheme adopted by the project personnel after discussion can effectively solve the problem in construction process of cast-in-place pile with pumping concrete in the complex geological environment caused by building waste backfilling. Simultaneously,ensure the quality of the cast-in-place pile with pumping concrete. Therefore, the analysis of problem ideas and specific solutions in this project have certain reference value for similar projects.

【基金】 国家自然科学基金(51408487);陕西省自然科学基础研究计划项目(2020JM-454);中国博士后科学基金第56批面上项目(2014M562437);陕西省博士后科学基金项目
  • 【会议录名称】 第33届全国结构工程学术会议论文集(第Ⅰ册)
  • 【会议名称】第33届全国结构工程学术会议
  • 【会议时间】2024-10-18
  • 【会议地点】中国辽宁阜新
  • 【分类号】TU753.3
  • 【主办单位】中国力学学会结构工程专业委员会、辽宁工程技术大学、中国力学学会《工程力学》编委会、清华大学土木工程系、水圈科学与水利工程全国重点实验室、土木工程安全与耐久教育部重点实验室(清华大学)