【摘要】 金沙江溪洛渡水电站混凝土拱坝坝高285.5m,河床坝基岩体为峨眉山玄武岩,Ⅲ1级岩体为主,局部分布受错动带影响的Ⅲ2级岩体,岩体声波平均速度4652m·s-1,小于4000m·s-1约占28%。固结灌浆处理后,坝基岩体的平均波速大于5200m·s-1,小于4000m·s-1的比例多在5%以下;Ⅲ1级岩体平均波速达53005500m·s-1,波速提高约2%5%;Ⅲ2级岩体平均波为42004700m·s-1,波速提高约12%18%;错动带平均波速36004200m·s-1,提高率在10%28%左右;岩体的透水率均小于3Lu;钻孔变形模量平均值达到10.015GPa。固结灌浆对Ⅲ2级岩体和错动带等地质缺陷具有明显的改善作用,坝基岩体的整体性和均一性得到了有效的提高。
【Abstract】 Xiluodu hydropower station is located on the Jinshajiang River,with a 285.5m high arch dam.The bedrock of the dam foundation consists of basalt,which can be dominantly classified as Ⅲ-1 class with some local distribution of disturbed Ⅲ-2 class.The average acoustic velocity of the bedrock is originally 4652m·s-1,with about28%being slower than 4000m?s-1.After consolidation grouting treatment,the average velocity is greater than5200m·s-1,with less than 5%being slower than 4000m·s-1.After treatment,the average velocity of the Ⅲ-1 class bedrock has reached 53005500m·s-1,being increased by 2%5%;the Ⅲ-2 class 42004700m?s-1,being increased by 12%18%;the disturbed belt 36004200m·s-1,being increased by 10%28%,respectively.The rock permeability are less than 3 Lu and the average borehole deformation modulus is 10-15 GPa.Consolidation grouting has dramatically improved the geological condition of the Ⅲ-2 class rock mass and the disturbed belt,which has effectively improved the integrity and homogeneity of the riverbed dam foundation.
【Key words】 Xiluodu hydropower station; Riverbed dam foundation; Consolidation grouting; Acoustic velocity;
- 【会议录名称】 2015年全国工程地质学术年会论文集
- 【会议名称】2015年全国工程地质学术年会
- 【会议时间】2015-08-10
- 【会议地点】中国吉林长春
- 【分类号】TV543.5