节点文献

隧道施工期地质超前预报若干问题探讨

THE INQUIRY OF SEVERAL PROBLEMS IN GEOLOGY PREDICTION DURING CONSTRUCTION OF TUNNELS

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 何发亮

【Author】 He Faliang Southwest Research Institute of China Railway Engineering,Chengdu,610031

【机构】 中铁西南科学研究院

【摘要】 随着人们环境保护意识的进一步提高和国家对安全生产的日益重视,作为隧道施工中极为重要的一项工作—隧道施工期地质超前预报工作正越来越为隧道工程建设者所重视。而补充地质调查、地质与物探结合、探测结果的产状修正、预报准确率正是困扰隧道施工期地质超前预报的至关重要的问题,本文就隧道施工期地质超前预报中此四问题作一探讨,希望对隧道施工期地质超前预报工作者有所帮助。

【Abstract】 Geology prediction during construction of tunnels, as an important work during construction of tunnelshas paid more and more attention by tunnel engineering builders, with the increasement of ideology forenvironmental protection and increasingly attach importance to safety in production. Supplementary geologyinvestigation, combination between geology and geophysical prospection, correction of result by occurrence andaccuracy of geology prediction are the key to success in geology prediction during construction of tunnelengineering. All questions above-mentioned will be discussed in this paper.

  • 【会议录名称】 第八次全国岩石力学与工程学术大会论文集
  • 【会议名称】第八次全国岩石力学与工程学术大会
  • 【会议时间】2004-10
  • 【会议地点】中国成都
  • 【分类号】U452.1
  • 【主办单位】中国岩石力学与工程学会
节点文献中: 

本文链接的文献网络图示:

本文的引文网络