200m级RCC重力坝优选渗控设计方案研究

Study on reasonable seepage control scheme of 200m height RCC gravity dam

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 崔皓东朱岳明

【Author】 CUI Hao-dong ZHU Yue-ming (College of Water Conservancy & Water Power,Hohai University,Nanjing 210098,China)

【机构】 河海大学水利水电工程学院

【摘要】 寻求合适的渗控措施以解决坝的渗流问题是高碾压混凝土坝技术发展的关键。以光照水电站200米级 RCC 重力坝为依托,利用节点虚流量全域迭代法和改进的排水孔模拟技术,对该坝上游面拟采用变态混凝土与二级配碾压混凝上组合防渗结构方案防渗效果进行了分析;研究了坝体可能出现的裂缝和排水孔幕的渗控作用。研究表明:该防渗型式可行,优势明显,能满足200米级 RCC 重力坝渗控要求,综合分析后提出了优选方案。

【Abstract】 It is key of development high RCC darn to find the seepage control measure to solve seepage. Based on the structural design of about 200m BCC gravity dam of Cuangzhao Hydropower project,the effectiveness of the seepage control schemes of the combination of distorted concrete face slab on dam up stream side with two graded aggregate RCC was analyzed by using procedure of nodal virtual flux of global iteration and improved method of drainage hole in detail;Mean while,the seepage control effect of drainage curtain in the dam body and the crack of dam was also studied.In the light of the results obtained,the seepage prevention scheme is proper structural type for the seepage control of the dam in 200m height.The more reasonable seepage prevention scheme is recommended.

【基金】 国家自然科学基金重点资助项目(50539020)
  • 【会议录名称】 2007重大水利水电科技前沿院士论坛暨首届中国水利博士论坛论文集
  • 【会议名称】2007重大水利水电科技前沿院士论坛暨首届中国水利博士论坛
  • 【会议时间】2007-11
  • 【会议地点】中国江苏南京
  • 【分类号】TV642.2
  • 【主办单位】中国工程院土木、水利和建筑工程学部、中国水利学会