节点文献

丁集矿冻结井可缩性接头位置优化

The Position Optimization of Frozen Shaft Vertical Reducible Tie-in in Dingji Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘树彪程桦

【Author】 Liu shubiao, Cheng hua (Huainan Mining Group Company Dingji Mine Construction Project Department,Huainan, Anhui 232060;Anhui University of Science and Technology Civil Engineering Department,Huainan, Anhui 232001)

【机构】 淮南矿业集团丁集煤矿安徽理工大学

【摘要】 针对丁集矿井的特殊水文地质条件,为防止井壁在冻结壁融沉和地层疏水沉降时发生破裂,在井壁设计时采用竖向可缩性结构,并提出了一种新型可缩性冻结井壁接头。模型试验表明:在竖向附加力作用下,研制的可缩性接头具有良好的压缩变形特性,抗侧压能力大,防水性能好,可应用于工程实际。

【Abstract】 Aiming at the special hydrogeological condition of Dingji mine, vertical reducible structure is adopted when the wall of a well is designed to prevent it from break while freezing wall is thawed and the stratum is settled ,and a new type reducible joint of freezing wall of a well is hold up. Model test indicate:at effect of vertical additive force, reducible joint has good characteristic of compressing distortion and resists greater side pressure and has good capability of waterproof, it can be applied to practice project.

  • 【会议录名称】 矿山建设工程新进展——2005全国矿山建设学术会议文集(上册)
  • 【会议名称】2005全国矿山建设学术会议
  • 【会议时间】2005
  • 【会议地点】中国乌鲁木齐
  • 【分类号】TD265.3
  • 【主办单位】煤炭建设与岩土工程专业委员会、全国高校矿山建设专业委员会
节点文献中: 

本文链接的文献网络图示:

本文的引文网络