节点文献
活套高度闭环与张力闭环投入时机的正确选择
The Time Decision to Active Strip Loop Control and Strip Tension Control of Loopers for Hot Strip Mill
【Author】 Zong Shengyue Guo Qiang Shentunankai Jing Fengwei Xiang Xiaofei (National Engineering Research Center for Advanced Rolling Technology of University of Science and Technology Beijing,Beijing,100083)
【机构】 北京科技大学高效轧制国家工程研究中心;
【摘要】 热连轧过程中活套高度闭环与张力闭环投入时机选择与活套起套过程密切相关,本文提出一种确定活套高度闭环投入时机的算法,经过现场的实际应用确认这是一种行之有效的方法。
【Abstract】 when to active strip loop control and strip tension control of loopers for hot strip mill mainly depend on the looper up procedure,this paper introduce an algorithm to determine the time to active strip loop control and strip tension control.With its successful application,it is proved that the algorithm is valid and useful.
- 【会议录名称】 2007中国钢铁年会论文集
- 【会议名称】2007中国钢铁年会
- 【会议时间】2007-11
- 【会议地点】中国四川成都
- 【分类号】TG335.1
- 【主办单位】中国金属学会