节点文献

山西孝义城(财)钢432m~3高炉强化冶炼技术攻关

Intensified smelting proceed with Chengcai Steel’s 432m~3 BF of Xiaoyi city in Shanxi

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 牛卫军张希刚田黎明刘凤军张全喜

【Author】 Niu Weijun Zhang Xigang Tian Liming Liu Fengiun Zhang Qianxi (Anyang Iron & Steel Group Co.,Ltd)

【机构】 安阳钢铁集团有限责任公司

【摘要】 对孝义城钢432m~3高炉强化冶炼技术攻关进行了总结。针对高炉存在的问题,在分析原燃料和设备等状况的基础上,应用对比分析的方法,制订合理的操作方针,采取了洗炉及使用斜风口;调整风口布局, 控制适宜压差;制定防止连续塌滑料预案;提高风温使用水平;摸索合适的装料制度;调整冷却制度;强化管理措施,使高炉风口烧坏现象大幅度减少,经济技术指标明显改善。

【Abstract】 Intensified smelting proceed with Chengcai Steel’s 432m~3 BF of Xiaoyi city is summarized.Aim at the existing question of BF,the reasonable operating policy is drew up by using ontrast and analysis methods based on anaysing BF burden and equipment ,and so on,a series of measures are adopted,such as erosion of BF with fluorite and using the slanting tuyere;adjusting tuyere arrangement,proper controlling the blast pressure difference; formulating plans to prevent consecutive landslide material;increasing the use of blast temperature;exploring the appropriate loading system;adjusting cooling system;strengthening management.The phenomenon of BF tuyere to burn out is decreased greatly,the economical technical indexs are improved significantly.

【关键词】 高炉分析调整操作
【Key words】 blast furnaceanalysisadjustoperation
  • 【会议录名称】 2007年中小高炉炼铁学术年会论文集
  • 【会议名称】2007年中小高炉炼铁学术年会
  • 【会议时间】2007-06
  • 【会议地点】中国广东珠海
  • 【分类号】TF538
  • 【主办单位】中国金属学会炼铁分会中小高炉学术委员会
节点文献中: 

本文链接的文献网络图示:

本文的引文网络