节点文献
钢管混凝土拱桥初应力问题
Review of Initial Stress on Concrete Filled Steel Tubular Arch Bridge
【Author】 HUANG Fu-yun CHEN Bao-chun (College of Civil Engineering and Architecture,Fuzhou University,Fuzhou 350002,China)
【机构】 福州大学土木建筑工程学院;
【摘要】 钢管混凝土结构在施工过程中会在钢管内产生初应力.本文综述了钢管混凝土柱的初应力问题和现有构件研究成果.在此基础上,分析了几座已修建的不同跨径及截面形式的钢管混凝土拱桥的初应力度的范围.同时对钢管混凝土拱桥的初应力问题进行了初步探讨,提出了钢管混凝土拱桥初应力问题的研究方向及建议.
【Abstract】 The steel tube of Concrete Filled Steel Tubular structure will produce initial stress while in the pro- cessing of construction.This paper reviews the initial stress problems of CFST architecture columns,and bases on the researching result of existing members,the paper also analyses the initial stress’ s degree about several existing kinds of different span and section-shape CFST arch bridges as well as preliminary analysis the initial stress problems of CFST arch bridge.In the end,the paper indicates some problems that need to be solving and presents its research current and advice about CFST arch bridge.
【Key words】 Concrete Filled Steel Tube; Arch Bridges; Degree of Initial Stress; Ultimate Carrying Capacity; Initial Stress;
- 【会议录名称】 中国钢结构协会钢-混凝土组合结构分会第十次年会论文集
- 【会议名称】中国钢结构协会钢-混凝土组合结构分会第十次年会
- 【会议时间】2005-05
- 【会议地点】中国黑龙江哈尔滨
- 【分类号】U448.22
- 【主办单位】中国钢结构协会钢-混凝土组合结构分会