节点文献

低水头拦河水利枢纽布置的探讨

Study on the layout of the low head hydro-engineering complex across the river

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 邱静杜涓黄本胜赖冠文

【Author】 Qiu Jing Du Juan Huang Ben-sheng LAI Guan-wen (Guangdong Research Institute of Water Conservancy & Hydro-Power, Guangzhou 510610,China; Guangdong Provincial Key Laboratory of Hydrodynamics, Guangzhou 510610,China)

【机构】 广东省水利水电科学研究院

【摘要】 低水头拦河水利枢纽一般都具有发电、通航的功能,由于库容小,电站多为径流式电站。洪水期必须开启全部泄洪闸,恢复天然河道的情况进行泄洪.而水闸泄洪、电站的引水防沙以及通航常常是相互矛盾的,枢纽的布置很大程度上就是如何解决三者之间的矛盾问题。本文以马房拦河水利枢纽工程模型试验为例,对低水头拦河水利枢纽布置的一般原则进行探讨。

【Abstract】 Low head hydro-engineering complex across a river generally has the functions as electricity generation and navigation. Because of the small capacity of the reservoir, therviver mostly is natural in the flood period and the shuices across the river mast be all o-pening. However, there are contradictions between floodwater releasing, diverting water for sand preventing and the security of navigation. The layout of the hydro-engineering complex must resolve these difficulties, we take the model of the flood control dam of MaFang-hydro -engineering complex as an example to discuss the principle of the layout of the low head hydro-engineering complex across the river.

  • 【会议录名称】 第十七届全国水动力学研讨会暨第六届全国水动力学学术会议文集
  • 【会议名称】第十七届全国水动力学研讨会暨第六届全国水动力学学术会议
  • 【会议时间】2003
  • 【会议地点】中国北京
  • 【分类号】TV61
  • 【主办单位】《水动力学研究与进展》编委会、中国力学学会、中国造船工程学会、香港科技大学、香港理工大学、中山大学、香港力学学会、上海交通大学、上海大学、上海市力学学会
节点文献中: 

本文链接的文献网络图示:

本文的引文网络