节点文献

大跨度桥梁钢箱梁拼接顶推施工过程线形控制的若干问题

Several Linear-Control Questions of Long Span Steel Box Girder in Spelling and Thrusting Case

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 吴皋颜东煌许红胜卢亚洲

【Author】 WU Gao, YAN Dong-huang, XU Hong-sheng, LU Ya-zhou (Changsha University of Science and Technology, School of Bridge and Structure Engineering, Changsha 410076, China)

【机构】 长沙理工大学桥梁与结构工程学院

【摘要】 以长沙市三汉矶大桥主桥钢箱梁顶推施工线形控制实践,研究了钢箱梁拼接施工控制体系的构成,阐述了线形控制原理、方法和计算模型,并对钢箱梁拼接的影响因素作了分析,给出修正对策.实时测控系统科学的指导了整个钢箱梁在项推平台的无应力拼接,确保了成桥钢箱梁的线形和设计的一致,取得较好效果,有较好的应用价值和推广前景.

【Abstract】 Through the practice of linear-control in construction of the San Cha Ji Bridge of Chang-sha, the composition of the construction of spelling steel box girder are studied. The linear-control theory, methods and calculating model are expounded. Based on the analysis of the influential elements in spelling steel box girder, modify countermeasures are proposed, while real-time surveying and controlling system used to guide the whole process of spelling the steel box girder with non-stress on the flat roof, which in order to ensure the linearity and the pressure of the bridge consistently with their designed values.

  • 【会议录名称】 2006钢桥科技论坛全国学术会议论文集
  • 【会议名称】2006钢桥科技论坛全国学术会议
  • 【会议时间】2006-12
  • 【会议地点】中国北京
  • 【分类号】U445.462
  • 【主办单位】茅以升科技教育基金会桥梁专业委员会
节点文献中: 

本文链接的文献网络图示:

本文的引文网络