大直径桩竖向荷载渐近破坏极限荷载判定法

THE DETERMINANT METHOD OF THE PIER AT ULTIMATE AND VERTICAL LOADING IN PROGRESSING FAILURE

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王明恕梁力董天文王凤池

【Author】 Wang ming-shu Liang li Dong tian-wen Wang feng-chi(The designing Institute of Northeastern University, Shenyang, 110004, China, The Northeastern University. Shenyang. 110004. China )

【机构】 东北大学设计研究院东北大学

【摘要】 大直径桩承载力高、施工简单、造价经济,问世以来得到很快应用。但其荷载下沉曲线没有突变拐点,工程设计时主要按试桩曲线允许下沉量相对的荷载作为设计依据,其安全程度的大小没有明确的数值概念。本文通过对大直径桩渐进破坏机理研究,经分析研究对比搜集到的跨越8年26项工程的52根试桩资料,用波兰曲线法可判定大桩承载力的极限值。故提出本文,供同行讨论参考。

【Abstract】 The load carrying capacity of the pier or the large diameter pile is larger than the capacity of the medium-sized and small-sized pile, and it is simple for construction and can get less costs of building. Also this foundation has been widely used in the civil engineering. But the P-S curves don’t have the sudden changeful point. In the designing of this research work, we mainly use the loading coming from P-S curves of testing pile and no certain value of its safety factor. We analyze the principle theory of the progressive failure of pier, for getting a real safety factor, and we use the Poland’s curve method and succeed the ultimate capacity of pier. These piers that we have gathered 52 piers in 26 works in 8 years have been done the ultimate loading capacity. So in this paper this idea is pointed out, and we please to discuss it by specialist of this field.

  • 【会议录名称】 第十三届全国结构工程学术会议论文集(第Ⅱ册)
  • 【会议名称】第十三届全国结构工程学术会议
  • 【会议时间】2004-10
  • 【会议地点】中国江西井冈山
  • 【分类号】TU473.1
  • 【主办单位】中国力学学会结构工程专业委员会、南昌大学土木工程学院、中国力学学会《工程力学》编委会、清华大学土木工程系