【机构】 海洋石油工程股份有限公司上海交通大学

【摘要】 对PL19-3油田30万吨FPSO安装连接过程进行模型试验研究。模型试验包括FPSO安装中的主要阶段—FPSO在拖轮协助下就位,连接交叉缆,FPSO与YOKE连接,YOKE压载灌浆及软管安装。模型试验结果用来确定安装时的环境条件和系泊就位缆绳,从而指导安装设计及施工程序的编写。

【Abstract】 The model test of 300,000-ton FPSO mating operation,which is installed at the PL 19-3 site in the Bohai Bay,is described in the paper.The following model tests have been anticipated to cover major installation activities,including FPSO Positioning Keeping with 5 tugs,crossing line installation,mating operations,yoke ballasting operations and jumper installation whose findings will be used to define the sea state limits and determine the mooring and positioning components.

【关键词】 FPSO安装连接模型试验
【Key words】 FPSOmating operationmodel test