节点文献

某基坑工程施工方案可行性分析

Feasibility Analysis of a Construction Plan of Foundation Pit Project

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 陈俊生莫海鸿刘叔灼陈平山

【Author】 CHEN Jun-sheng,MO Hai-hong,LIU Shu-zhuo,CHEN Ping-shan (Dept of Civil Engineering,South China University of Technology,Guangzhou 510640,China)

【机构】 华南理工大学土木工程系

【摘要】 利用三维有限元法,对某基坑工程的"吊脚桩"加桩间预应力锚索方案进行动态施工全过程数值模拟,重点分析了在基坑施工过程中周围土层及岩层的位移。分析结果表明,该基坑工程采用"吊脚桩"加桩间预应力锚索方案进行施工,土层的位移不大于20 m,岩层位移在1—3 m之间,场地整体稳定性好,不会因基坑开挖导致土层沿岩面整体滑移动,因而该施工方案可行。

【Abstract】 3D finite element method was used to simulate the entire dynamic construction process of suspended piles and prestress anchor wire between piles of a foundation pit project.The analysis focused on displacement of soil strata and rock strata in the process of construction.The analysis results indicate that,under this construction plan, the displacement of soil strata is less than 20 mm,and the displacement of rock strata is 1—3 mm.The resistance of overturning of ground is appropriate.The soil strata will not slide along the rock surfaces.The construction plan is feasible.

  • 【会议录名称】 中国岩石力学与工程实例第一届学术会议论文集
  • 【会议名称】中国岩石力学与工程实例第一届学术会议
  • 【会议时间】2007-12-15
  • 【会议地点】中国海南三亚
  • 【分类号】TU753
  • 【主办单位】中国岩石力学与工程学会工程实例专业委员会
节点文献中: 

本文链接的文献网络图示:

本文的引文网络