节点文献
地铁区间隧道对雨水暗渠影响的数值模拟及实测分析
Numerical simulation of the influence of running tunnel construction on drainage culvert and measurement analysis
【Author】 Zhang Liang,Xu Hongwei,Li Tao School of Civil Engineering,Southwest Jiaotong University,Chengdu
【机构】 西南交通大学交通隧道工程教育部重点实验室; 西南交通大学土木工程学院;
【摘要】 地铁隧道的开挖对既有城市暗渠及管线的影响是城市地铁建设的重点,文章通过隧道支护结构、周围土体以及雨水暗渠耦合作用的三维有限元分析模型,对青岛地铁3号线江西路站至宁夏路站区间隧道开挖对雨水暗渠的影响进行了仿真分析,并结合实际监控量测结果对隧道施工提出了相关建议。
【Abstract】 The influence on the drainage culvert and pipelines caused by metro excavation has been the key points in metro engineering.In this paper,applying the three - dimension FEM analysis model considering the coupling action of tunnel support structure,soil and drainage culvert,the simulation analysis of the construction effect of the tunnels on the drainage culvert is per formed between Jiangxi Road Station and Ningxia Road Station of Qingdao Metro line 2,and,combining with the actual measured data.In the end,some instructive conclusions to the metro construction are drawn.
【Key words】 Metro station tunnel; drainage culvert; numerical simulation; monitoring measurement;
- 【会议录名称】 第十二届海峡两岸隧道与地下工程学术与技术研讨会论文集
- 【会议名称】第十二届海峡两岸隧道与地下工程学术与技术研讨会
- 【会议时间】2013-08-17
- 【会议地点】中国四川峨眉山
- 【分类号】U451
- 【主办单位】中国土木工程学会隧道及地下工程分会、中国岩石力学与工程学会地下工程分会、台湾隧道协会