节点文献

深圳市福田站地下综合交通枢纽工程配套设施盖挖逆作施工方法与结构整体有限元分析

Cover and Cut Method and Finite Element Analysis of Comprehensive Transportation in Futian Subway Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘畅张剑檀传江李博雅

【Author】 Liu Chang,Zhang Jian,Tan Chuanjiang,Li Boya

【机构】 深圳大学建筑设计研究院

【摘要】 简要介绍深圳市福田站地下综合交通枢纽工程配套设施盖挖逆作法施工方法与结构整体的有限元分析。考虑了土体参数对结构受力及变形的影响,利用弹簧单元模拟土对结构的作用,采用有限元程序分施工阶段和使用阶段对整个结构进行计算分析,较真实反映了结构构件的受力及变形,为类似工程提供了一定的经验参考。

【Abstract】 It is brieftly introduced that the cover and cut method is chosen for the comprehensive transportation hub project facilities in Shenzhen Futian subway station and this structure is simulated with finite element analysis.Taking the impact of stress and deformation of structure from the soil around the construction into account,the spring element is used to simulate the action between the soil and structure in finite element analysis of construction and operation stage,which can get more accurate results and provide a reference for similar projects.

  • 【会议录名称】 建筑结构(2009·增刊)——第二届全国建筑结构技术交流会论文集
  • 【会议名称】第二届全国建筑结构技术交流会
  • 【会议时间】2009-04-24
  • 【会议地点】中国上海
  • 【分类号】TU93
  • 【主办单位】亚太建设科技信息研究院、中国建筑设计研究院、中国土木工程学会
节点文献中: 

本文链接的文献网络图示:

本文的引文网络