节点文献
复杂钢框架核心筒连体高层建筑施工过程分析
Construction Sequence Analysis of Skybridge Connected Complex Steel Frame Core-wall Tall Building
【Author】 Sun Huahua~(1,2),Zhao Xin~1,Ding Jiemin~1,Zheng Yimin~1,Yan Xingxiang~2 1 The Architectural Design&Research Institute of Tongji University,Shanghai,200092,China; 2 Department of Building Engineering of Tongji University,Shanghai,200092,China)
【机构】 同济大学建筑设计研究院; 同济大学建筑工程系;
【摘要】 考虑到施工顺序和加载条件的不同、施工期间构件材料强度的发展以及混凝土的收缩、徐变时随特性等非荷载效应的影响,实际的结构效应与建立整个结构模型后获得的分析结果将存在相当大的差异。施工过程分析是复杂高层或超高层建筑结构设计的重要内容。本文通过对复杂钢框架核心筒结构进行了施工过程模拟,分析了徐变和收缩等对剪力墙变形、结构竖向差异变形、钢框架柱轴力等因素的影响,可为实际施工提供合理的参考依据。
【Abstract】 Considering the construction sequence,loading conditions,and inelastic effects such as shrinkage and creep, there may exist great discrepancies between the actual structural forces and analytical results calculated by the whole structural model.Construction sequence analysis is important for the structural design of tall buildings.Construction analysis of a skybridge connected complex steel frame core-wall tall building is studied in this paper.The influences of shrinkage and cree Pof reinforced concrete core-wall are discussed.Some useful conclusions are obtained and can provide reasonable references for real construction.
【Key words】 Shrinkage; Creep; Inelastic effect; Construction analysis; Vertical differential deformation;
- 【会议录名称】 建筑结构(2009·增刊)——第二届全国建筑结构技术交流会论文集
- 【会议名称】第二届全国建筑结构技术交流会
- 【会议时间】2009-04-24
- 【会议地点】中国上海
- 【分类号】TU973.13
- 【主办单位】亚太建设科技信息研究院、中国建筑设计研究院、中国土木工程学会