节点文献

某下沉式广场上浮事故的分析与处理措施

Analysis and solutions for a sunken plaza rising

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 凌育洪凌宏华吴昀泽刘荣

【Author】 Ling Yuhong1,Ling Honghua2,Wu Yunze2,Liu Rong2(1 Architecture Design Institute of South China University of Technology,Guangzhou 510641,China;2 Department of Civil Engineering of South China University of Technology,Guangzhou 510640,China)

【机构】 华南理工大学建筑设计研究院华南理工大学土木工程系

【摘要】 某下沉式广场在施工过程中遭受暴雨袭击,造成地下室不均匀上浮,最大上浮量为191mm。针对该工程事故,分析了上浮和开裂产生的原因,制定了相应的加固处理方案。重点介绍了采用预应力锚杆以消除变形差异在结构内部产生附加内力的方法,取得了预期的效果。

【Abstract】 A basement of sunken plaza was subjected to rainstorm during the construction period,which made the basement float unevenly,and the maximum floating value was 191mm.The causes of floating and cracking were analyzed,and reinforcement programs were made accordingly.Prestressed anchors were used in order to eliminate additional internal force,which was generated by uneven deformation,and expected effects were obtained.

  • 【会议录名称】 第二届全国工程结构抗震加固改造技术交流会论文集
  • 【会议名称】第二届全国工程结构抗震加固改造技术交流会
  • 【会议时间】2010-06-18
  • 【会议地点】中国上海
  • 【分类号】TU943
  • 【主办单位】《建筑结构》杂志社、《施工技术》杂志社、中国建筑设计研究院
节点文献中: 

本文链接的文献网络图示:

本文的引文网络