S项目住宅工程建安成本后评估报告

【作者】 王晶

【导师】 丁立宏;

【作者基本信息】 首都经济贸易大学 , 工商管理(专业学位), 2015, 硕士

【摘要】 随着房地产开发业逐渐发展,我国建设工程的各项规范制度也逐渐建立、规范、精益求精,在发展的过程中逐渐总结经验、教训并学习国外先进经验和技术。随着开发成本的逐渐提高,建安成本后评估越来越受到国家、政府相关部门以及相关企业的重视。在建安成本后评估中,检查投资预期效果和预期成本,总结过程管理的经验,积累建安成本基础数据,分析存在的问题,提出建议并应用到新的项目中,为后期项目的开展提供帮助。本文结合L公司开发的S项目住宅工程,采用实地调查与文案调查相结合,定量分析与定性分析相结合的方法,对其钢筋、混凝土单方指标进行分析,对比同类项目的经验数据,检查本项目的结构设计合理性;对其结算价格和投资估算进行对比,并分析产生问题的原因;分析项目的单方造价以及各项单方指标,并参照北京市造价处颁布的参考指标,来分析项目各项指标的得失,并根据分析产生该结果的原因。在本文最后从设计、项目管理以及成本管理三方面总结了S项目住宅工程各阶段、各部门的工作情况,并将存在的问题予以剖析。希望通过本文的研究可以为L公司今后的项目投资活动管理,甚至建安成本后评估工作提供借鉴的意义。

【Abstract】 As the development of the real estate industry, construction regulations system has been established, specified and refined on in our country gradually. We sum up the experience and lessons on ourselves, learn advanced technology and experience abroad,during the development. With the rapid development in the cost of the real estate, the post project of the construction cost has been paid more and more attention by our country, the relevant government and the real estate companies. During the study on the post project of the construction cost, we check the expected results and the expected cost by the construction settlement of accounts, summarize the experience of process management,accumulate the basic data on construction cost, find the existing problems on ourselves, and give advice applied to new projects, to provide help for the development of the forward project.The paper, which based on the S residential project invested by L company,integrating textual criticism literatures with field survey, and the combination quantity and quality analysis, to check whether the structure design is reasonable by taking the unilateral index into the steel and concrete of the project to the empirical data of other projects;compare the settlement cost to the investment estimate, and analyze the cause of the result;compare every unilateral index published by Beijing engineering cost management office to the corresponding index of S project, to show the effort of every item of the project, and analyze the reason. The paper summarizes the work effort of every stage by every department of S project, through design, project management and cost management, and analyzes the problems. Hope that, the discussion by this paper can be used by other project investment, and even can be used by the construction cost of post evaluation of others.

  • 【分类号】F406.72;F426.92
  • 【被引频次】2
  • 【下载频次】270
节点文献中: 

本文链接的文献网络图示:

本文的引文网络