某工程通风空调专业项目突发事件管理

HVAC(Heating, Ventilation & Air-Conditioning) Project Emergency Events Management

【作者】 吴刚

【导师】 赵振全; 甘承军;

【作者基本信息】 吉林大学 , 项目管理, 2010, 硕士

【摘要】 现代工程项目管理过程不确定因素很多,在施工过程中面临着多种危机,并且无论哪种危机发生,都有可能给工程项目带来致命的打击。项目应急管理即突发事件管理对于建筑企业实现长期稳定发展也愈发显得重要。本文以某工程通风空调专业项目实施管理过程为例,针对如何应对突发事件展开课题研究。以项目管理的角度对可能发生的突发事件进行系统的规划管理,首先强调全体项目部成员树立全员危机意识,对可能发生的突发事件高度重视并进行事前认真的分析,根据不同角度如安全事故控制、劳动力短缺问题、突发传染病可能性、各专业配合影响等进行分析,通过分析的结果制定出不同类型的突发事件应对预案,在项目管理过程中发生的不同突发事件时,冷静的按照制定的预案应对,及时按照预案程序启动实施,并取得了较好的结果。在现代工程项目管理过程大部分建筑企业没有建立自己的突发事件管理系统,本文希望在建筑企业在项目管理过程中树立危机意识,建立并完善突发事件管理系统。

【Abstract】 Modern project management process many uncertainties, during construction is faced with a variety of crisis, and whatever the crisis, has the potential to bring to the project. Project management for emergency building enterprises achieve long-term stable development is more important.This article for ventilation and air conditioning engineering professional installation project, for example. It describes a project profiles, as well as project management, quality objectives, security, construction, construction target, etc. Simple described the project organization, staff. At the same time under general contract schedule and tender documents requirements of key nodes deadlines, developing plans for ventilation and air conditioning engineering progress.Highlights from the four aspects of an emergency that may occur. The first is safety accident prevention, through prior to construction of security management for careful planning and organization, rigorous program, strict management and staff the best combination of, developing targeted and operability of the construction design, construction and technical measures to guarantee the safety and security management system, so that the construction process of divisions, itemized, operations are organized in the managed security status, thereby finally implement the security goals. Key risk sources:aerial work, cross job; inflammable, explosive materials handling, storage and management. Secondly from deeper analysis of the labor shortage ", by labour shortage. Guarantee period of stability of labor, the project duration from November 15,2008 to 2009 on September 1. One of the two nodes is the focus of labor drain:the first period of the Spring Festival, the second period is the wheat harvesting. Once again, in order to effectively deal with the epidemic of infectious diseases, to the greatest extent possible to prevent or reduce the epidemic on the site may result in damage, security engineering officers and migrant worker’s safety, maintenance of social stability and economic development, the need for a perfect plan. There is also construction engineering technology, governance, professional coordination and cooperation between, is vital and should not be ignored. Works in various professional cross-site mostly minor things, generally have little effect on the project. But sometimes it appears some of the larger problem, so it is very difficult to remedy, or even irreparable.For four issues, make the appropriate countermeasures. Safe emergency fire prevention and control is in focus, separate the works of the actual situation and field surrounded by a total package for fire protection requirements, in order to prevent all kinds of theft, destruction, fire cases occur, formulates the fire protection plan. Other includes:chemicals, oil spill contingency measures; dust pollution emergency measures; water pollution emergency measures; noise pollution emergency measures; work-related injuries and occupational diseases emergency measures; chemicals acute injury emergency first aid) measures; (benzene poisoning emergency measures; falling damage emergency first-aid measures; () injuries first aid emergency (collapse) points; emergency first aid) electric shock (measures) burning (hot staff first aid measures; accident emergency first aid; food poisoning (first aid) measures to reduce the risk of first aid; after treatment should be how to frostbite; gas poisoning of emergency preparedness measures, etc. Workforce solutions proposed by improving labor wages, to improve the wages guarantee democracy can design; back pay is the root of the problem, workers’payment has been a difficult problem; to establish a long term cooperation stable construction teams; improve enterprise culture and other measures. Emergent infectious disease emergency response plan based on the sudden epidemic occurred, development law and characteristics, hazards and possible trends, it is divided into major (in particular) and major (IIB), large (class) and General (grade) four levels, set up a public health emergency command group organization to cope with any emergency situation. In various professional coordination measures detailed in the scheme: the total package and and civil engineering unit, and subcontractor work together, and decorated unit, and the Government or the relevant administrative units.On a few pieces of emergencies, in accordance with the prior plan first started the emergent infectious diseases (H1N1) prevention and control measures. Strengthening construction site outbreaks have been reported to work, so early detection, early reports, early isolation, early treatment. The construction contractors unit, on the construction site management accountability. Various professional subcontractors, service subcontract units in accordance with their respective responsibilities to obey the construction unit, General Contracting units of management. Supervision units on the construction site management. Strengthening the site surrounding retaining construction, the site surrounding block must be carefully secured. The construction site must be equipped with adequate security officers, non-construction personnel randomly. With construction contractors, construction unit to take control of the construction site site staff changes. On the new approach of construction personnel required to measure body temperature, fever symptoms to doctor and health departments require action. To improve construction site living area housing conditions, each housing officers shall consist of not more than 15 people, hostels shall showed, each bed area shall not be less than 1.9 m X0.9 m area, bed space of not less than 0.3 m), the bed floor shall not exceed 2 layer, indoor channel width of not less than 0.9 m. Hostel must ensure that the necessary living space, indoor height not less than 2.5 metres, set to open the window, maintain good ventilation in the House. From the above measures, until the completion of this project is not a case of influenza a (H1N1) infection, no other infectious disease epidemics.In cooperating with other professional in three events. Top equipment replacement and tower crane dismantling time conflict problems, top-level equipment replacement and tower crane dismantling time conflict problems, electric, water supply professional progress seriously lagged effects of the professional system debugging issue, pursuant to a prior plan, positive and relevant professional communication, will be satisfied with the results.In the project management process most construction enterprises do not have to establish its own emergency management system, this article emphasizes building enterprise project management process must have a sense of crisis, setting up and perfecting the emergency management system. In the event of a sudden event, taking the right approach to dealing with emergencies to reduce or eliminate emergencies on the destruction of the enterprise.In the project management process most construction enterprises do not have to establish its own emergency management system, this article emphasizes building enterprise project management process must have a sense of crisis, setting up and perfecting the emergency management system. In the event of a sudden event, taking the right approach to dealing with emergencies to reduce or eliminate emergencies on the destruction of the enterprise.

  • 【网络出版投稿人】 吉林大学
  • 【网络出版年期】2010年 10期
  • 【分类号】F284
  • 【被引频次】1
  • 【下载频次】134
节点文献中: 

本文链接的文献网络图示:

本文的引文网络