节点文献

机械化大断面法隧道施工力学行为及时空效应研究

Study on Mechanical Behaviors and Spatiotemporal Effects in Mechanized Large-section Tunnelling

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王志龙王明年张霄童建军刘大刚马治中

【Author】 WANG Zhilong;WANG Mingnian;ZHANG Xiao;TONG Jianjun;LIU Dagang;MA Zhizhong;Sichuan Vocational and Technical College of Communications;Key Laboratory of Transportation Tunnel Engineering,Ministry of Education,Southwest Jiaotoug University;School of Civil Engineering,Southwest Jiaotoug University;State Key Laboratory of Intelligent Geotechnics and Tunnelling;China Railway Construction Bridge Engineering Bureau Group Third Engineering Co.,Ltd.;

【机构】 四川交通职业技术学院西南交通大学隧道工程教育部重点实验室西南交通大学土木工程学院极端环境岩土和隧道工程智能建养全国重点实验室中铁建大桥工程局集团第三工程有限公司

【摘要】 郑(州)-万(州)高速铁路湖北段隧道工程是我国钻爆法隧道实现全工序机械化施工的典型案例。该工程具有开挖面积大、开挖进尺长以及施工效率高的特点,因而与传统小型机械分部开挖模式下的隧道施工力学行为和时空效应存在显著差异。采用数值计算及现场测试方法,研究机械化大断面法隧道施工力学行为及时空效应。研究结果表明,大断面开挖降低了掌子面的稳定性(预收敛变形最大值增大40%),空间效应减弱,通过超前支护有效控制掌子面的稳定性对于大断面法施工隧道尤为重要;大断面法施工隧道支护一次成型,且封闭较快,可以有效抑制初期支护的整体沉降(最终收敛变形减小22.5%)。相同施工条件下,相比于C30普通喷射混凝土,采用C30早高强喷射混凝土支护可使隧道收敛变形减小20.1%,表明随着空间效应的减弱和开挖进尺的增大,支护结构在初期阶段迅速获得较强的承载性能可有效控制隧道变形。

【Abstract】 The tunnel projects in Hubei section of Zhengzhou-Wanzhou High-speed Railway represents a typical case of fully mechanized drill and blast method tunnelling in China. Characterized by large excavation area, extended advance length, and high construction efficiency, it demonstrates significant differences in mechanical behaviors and spatiotemporal effects compared to traditional small-scale mechanical partial excavation methods. Through numerical simulations and field tests, this study investigates the mechanical behaviors and spatiotemporal effects in mechanized construction of large-section tunnels. Key findings include:(1) Large-section excavation reduces face stability(40% increase in maximum pre-convergence deformation) and weakens spatial effects, making advanced support crucial for face stability control;(2) The single-stage support system with rapid closure in large-section construction effectively restrains overall settlement(22.5% reduction in final convergence deformation);(3) Under identical conditions, C30 early-high-strengh shotcrete reduces tunnel convergence deformation by 20.1% compared to C30 ordinary shotcrete, demonstrating that rapid development of high bearing capacity of support structure in early stages could effectively control deformation as spatial effects diminish and advance lengths increase.

【基金】 中国国家铁路集团有限公司系统性重大项目(P2018G048);成都市科技计划项目(2022-XT00-00002-GX);重庆市交通科技项目(2022-05)
  • 【文献出处】 现代隧道技术 ,Modern Tunnelling Technology , 编辑部邮箱 ,2025年03期
  • 【分类号】U455.4
  • 【下载频次】21
节点文献中: 

本文链接的文献网络图示:

本文的引文网络