节点文献

基于内生不确定性的船舶舾装生产集成优化调度模型研究(英文)

Integrated Optimization Scheduling Model for Ship Outfitting Production with Endogenous Uncertainties

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘利军曹埔周雅婧龙智新蒋祖华

【Author】 Lijun Liu;Pu Cao;Yajing zhou;Zhixin Long;Zuhua Jiang;College of Mechanical&Electrical Engineering,Shaanxi University of Science&Technology;School of management,Hefei University of Technology;School of Mechanical Engineering,Shanghai Jiao Tong University;

【通讯作者】 刘利军;

【机构】 College of Mechanical&Electrical Engineering,Shaanxi University of Science&TechnologySchool of management,Hefei University of TechnologySchool of Mechanical Engineering,Shanghai Jiao Tong University

【摘要】 Ship outfitting is a key process in shipbuilding. Efficient and high-quality ship outfitting is a top priority for modern shipyards. These activities are conducted at different stations of shipyards. The outfitting plan is one of the crucial issues in shipbuilding. In this paper, production scheduling and material ordering with endogenous uncertainty of the outfitting process are investigated. The uncertain factors in outfitting equipment production are usually decision-related, which leads to difficulties in addressing uncertainties in the outfitting production workshops before production is conducted according to plan. This uncertainty is regarded as endogenous uncertainty and can be treated as non-anticipativity constraints in the model. To address this problem, a stochastic two-stage programming model with endogenous uncertainty is established to optimize the outfitting job scheduling and raw material ordering process. A practical case of the shipyard of China Merchants Heavy Industry Co., Ltd. is used to evaluate the performance of the proposed method. Satisfactory results are achieved at the lowest expected total cost as the complete kit rate of outfitting equipment is improved and emergency replenishment is reduced.

【Abstract】 Ship outfitting is a key process in shipbuilding. Efficient and high-quality ship outfitting is a top priority for modern shipyards. These activities are conducted at different stations of shipyards. The outfitting plan is one of the crucial issues in shipbuilding. In this paper, production scheduling and material ordering with endogenous uncertainty of the outfitting process are investigated. The uncertain factors in outfitting equipment production are usually decision-related, which leads to difficulties in addressing uncertainties in the outfitting production workshops before production is conducted according to plan. This uncertainty is regarded as endogenous uncertainty and can be treated as non-anticipativity constraints in the model. To address this problem, a stochastic two-stage programming model with endogenous uncertainty is established to optimize the outfitting job scheduling and raw material ordering process. A practical case of the shipyard of China Merchants Heavy Industry Co., Ltd. is used to evaluate the performance of the proposed method. Satisfactory results are achieved at the lowest expected total cost as the complete kit rate of outfitting equipment is improved and emergency replenishment is reduced.

【基金】 supported in part by the High-tech ship scientific research project of the Ministry of Industry and Information Technology of the People’s Republic of China;the National Nature Science Foundation of China (Grant No.71671113);the Science and Technology Department of Shaanxi Province (No.2020GY-219);the Ministry of Education Collaborative Project of Production,Learning and Research (No.201901024016)
  • 【文献出处】 Journal of Marine Science and Application ,哈尔滨工程大学学报(英文版) , 编辑部邮箱 ,2025年01期
  • 【分类号】U671.91
  • 【下载频次】17
节点文献中: 

本文链接的文献网络图示:

本文的引文网络