深厚填土高边坡三排桩刚架支挡结构受力分析

Stress Analysis of Three-row Pile Rigid Frame Retaining Structure in High Slope with Deep and Thick Backfill Soil

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 石洋海赵小云王贤能周伦才王玥

【Author】 Shi Yanghai;Zhao Xiaoyun;Wang Xianneng;Zhou Luncai;Wang Yue;Shenzhen Geokey Group Co., Ltd.;Institute of Modern Physics, Chinese Academy of Sciences;

【机构】 深圳市工勘岩土集团有限公司中国科学院近代物理研究所

【摘要】 针对深厚填土高边坡中单排悬臂桩、桩锚支护、双排桩、h型桩等支护结构存在的不足,分析探讨了三排桩刚架支挡结构。研究表明,三排桩刚架支挡结构用于支护深厚填土高边坡,可以同时起到“收坡”、“固脚”作用,既能节约用地,又可以有效发挥支挡作用。通过工程实例,分别采用位移法、MIDAS GTX NX有限元软件进行计算分析,对比结果表明,采用位移法简化方法可近似计算三排桩刚架支挡结构的弯矩。三排桩钢架支挡结构设计时应加强前排桩和连梁的截面刚度,保证节点位置刚性连接,刚架结构分级高度应大致均匀布置,且应尽量减少后排桩悬臂段高度。

【Abstract】 The supporting structures of single row cantilever pile, pile-anchor support, double row pile, H-type pile and other supporting structures have deficiencies in high slope with deep and thick backfill soil. In view of the deficiencies, three-row pile rigid frame retaining structure was analyzed. In supporting deep fill high slope, the three-row pile rigid frame retaining structure can simultaneously play the role of "retracting slope" and "reinforce the foot of the slope". The application of this structure could save land and realize retaining effectively. Through engineering examples, displacement method and MIDAS GTX NX finite element software were used for calculation and analysis. The comparison results show that the simplified displacement method can be used to approximate the bending moment of three-row pile rigid frame retaining structure. The section rigidity of front pile and connecting beam should be strengthened in the design, and ensure that the nodes are rigidly connected. The grading height of rigid frame structure should be roughly uniform and the cantilever height of rear pile should be reduced as much as possible.

【基金】 国家“十二五”重大科技基础设施项目(编号:发改高技[2015]3185和3187号)
  • 【文献出处】 岩土工程技术 ,Geotechnical Engineering Technique , 编辑部邮箱 ,2023年02期
  • 【分类号】TU473
  • 【下载频次】34