节点文献

旋流竖井泄洪洞水力学特性及泥沙输移特性研究

Study on Hydraulic Characteristics and Sediment Transport Characteristics of Vortex Shaft of Spillway Tunnel

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 蔡豪锋张建民陈学艳王乃飞颜晶冉肖发新吴云峰

【Author】 CAI Hao-feng;ZHANG Jian-min;CHEN Xue-yan;WANG Nai-fei;YAN Jing-ran;XIAO Fa-xin;WU Yun-feng;State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University;Three Gorges Ecological Environment Investment Co., Ltd.;Changyang Rixin Ecological Management Co., Ltd.;Changyang Tujia Autonomous County Water Resources and Lakes Bureau;

【通讯作者】 张建民;

【机构】 四川大学水力学与山区河流开发保护国家重点实验室三峡生态环境投资有限公司长阳日新生态治理有限公司长阳土家族自治县水利和湖泊局

【摘要】 基于RNGκ-ε双方程紊流模型并结合VOF两相流模型,通过模型试验和数值模拟分析了双涡室旋流竖井流态、流速、压力、消能、空化和泥沙输移特性。结果表明,模拟结果与试验值吻合程度较好,涡室段通过掺气坎补气,掺气更加充分,降低了发生空蚀破坏可能性;实测消能率达到75%以上,消能效果较好;不同粒径泥沙在不同流量下在竖井底部存在泥沙淤积,使得消力井深度减小,小流量运行时淤沙最高可达到消力井深度的72%,但经过一次大洪水后泥沙被清空,淤沙高度降低为井深的1.6%,使旋流竖井保持有足够的消能水垫,不会影响其正常运行。在实际工程中,控制拦污栅大小,避免大颗粒泥沙进入泄洪洞导致拥堵,实践中可通过改变运行方式来控制消力井淤沙高度,使其有足够富裕的水垫深度来满足旋流竖井设计和正常运行要求。

【Abstract】 Based on the RNG Κ-ε double-equation turbulence model and the VOF two-phase flow model, the flow regime, flow velocity, pressure, energy dissipation, cavitation and sediment transport characteristics of the double volute chamber vortex shaft were studied using model test and numerical simulation. The results were in good agreement with the experimental values. The vortex chamber was more thoroughly dosed with gas through an aerator device, which reduced the possibility of cavitation erosion. The measured energy dissipation rate exceeded 75%, indicating a good energy dissipation effect. The sediment siltation existed at the bottom of the shaft for various particle sizes at various flow rates, reducing the depth of the stilling well. At low flow operation, the siltation might reached up to 72% of the stilling well’s depth. However, the sediment was cleared away after a big flood and the silt height was lowered to 1.6% of the well depth, enabling the cyclone shaft to have a sufficient water cushion for energy dissipation that would not interfere with its regular functioning. Control the size of the barrage in actual projects to prevent congestion caused by large particles of sediment entering the floodway. In actuality, the operating mode can be altered to control the stilling well’s silting height, ensuring that it has sufficient rich water cushion depth to match the cyclone shaft’s design and regular operation requirements.

【基金】 国家自然科学基金重点项目(52130904)
  • 【文献出处】 水电能源科学 ,Water Resources and Power , 编辑部邮箱 ,2023年03期
  • 【分类号】TV135.2;TV142
  • 【下载频次】51
节点文献中: 

本文链接的文献网络图示:

本文的引文网络