节点文献

基于排水模型的公园海绵城市改造效果评估

Evaluation of park sponge city reconstrution effect based on drainage model

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李德师; 郑承军; 张晔; 温子宁; 任俊雯;

【Author】 Li Deshi;Zheng Chengjun;Zhang Ye;Wen Zining;Ren Junwen;Guangzhou Urban Planning & Design Survey Research Institute;

【机构】 广州市城市规划勘测设计研究院;

【摘要】 采用排水模型软件Infoworks ICM评价海绵城市建设效果已经成为行业趋势,然而大部分从业者仅关注软件的使用,忽视LID的模拟原理,未关注到可能存在的模拟误差。阐述两种LID模拟方法的原理,并分析由于子汇水区重新分割带来的模拟误差。以汕头市某公园的海绵改造项目为例,构建ICM海绵模型,推荐采用LID设施占据整个子汇水区的方法评估典型年降雨条件下的海绵建设效果,结果表明,LID设施能在源头有效控制雨水径流和污染,为后续海绵建模提供参考和经验。

【Abstract】 Using drainage model software Infoworks ICM to evaluate the effect of spongy city construction has become an industry trend. However, most engineers only focus on the use of the software, ignoring the simulation theory of LID controls, and pay no attention to the possible simulation errors. The principle of two LID simulation methods was described, and the simulation errors due to subcatchment re-segmentation were analyzed. Taking the sponge reconstrution project simulated by Infoworks ICM software of a park in Shantou city as an example, it was recommended to use the method of LID facilities occupying the entire subcatchment to evaluate the effect of sponge city construction under typical annual rainfall condition, the result showed that LID controls can effectively control stormwater runoff and pollution at the source, so as to provide reference for subsequent sponge city modeling.

  • 【文献出处】 山西建筑 ,Shanxi Architecture , 编辑部邮箱 ,2022年19期
  • 【分类号】TU986;TU992
  • 【下载频次】138
节点文献中: 

本文链接的文献网络图示:

本文的引文网络