节点文献
钒渣提钒和铬循环冶金工艺:(Ⅱ)沉钒后液分离回收铬(英文)
Cyclic metallurgical process for extracting V and Cr from vanadium slag: Part Ⅱ. Separation and recovery of Cr from vanadium precipitated solution
【摘要】 研究通过用PbCO3沉淀并用Na2CO3溶液浸出从钒沉淀溶液中分离和回收铬的循环冶金工艺。沉钒后液pH调至3.0后,按Pb/Cr摩尔比2.5加入PbCO3,在30°C搅拌180 min,铬浓度从2.360 g/L降到0.001 g/L。过滤后,沉铬富集渣用热Na2CO3溶液浸出得到含有Na2CrO4的浸出液和含有PbCO3的浸出渣。沉铬富集渣按液固比10:1 m L/g加入到0.5 mol/L的Na2CO3溶液中,调pH到9.5,在70°C搅拌60min,铬的浸出率为96.43%。过滤后,浸出渣返回沉铬,浸出液循环浸出铬直至Na2CrO4接近饱和。最后,浸出液蒸发结晶后获得Na2CrO4·4H2O产物。
【Abstract】 Cyclic metallurgical process for separation and recovery of Cr from vanadium precipitated solution by precipitation with PbCO3 and leaching with Na2CO3 was investigated. The concentration of Cr residue in the solution decreases from 2.360 to 0.001 g/L by adding PbCO3 into vanadium precipitated solution according to Pb/Cr molar ratio of 2.5, adjusting the pH to 3.0 and stirring for 180 min at 30 °C. Then, the precipitates were leached with hot Na2CO3 solution to obtain leaching solution containing Na2CrO4 and leaching residue containing PbCO3. The leaching efficiency of Cr reaches 96.43% by adding the precipitates into 0.5 mol/L Na2CO3 solution with the mass ratio of liquid to solid(L/S) of 10:1 mL/g and stirring for 60 min under pH 9.5 at 70 °C. After filtration, leaching residue is reused in Cr precipitation and leaching solution is used to circularly leach the Cr precipitates until Na2CrO4 approaches the saturation. Finally, the product of Na2CrO4·4H2O is obtained by evaporation and crystallization of leaching solution.
【Key words】 vanadium precipitated solution; lead salt precipitating chromium; sodium carbonate leaching chromium; cyclic metallurgical process;
- 【文献出处】 Transactions of Nonferrous Metals Society of China ,中国有色金属学报(英文版) , 编辑部邮箱 ,2021年09期
- 【分类号】X757;TF791;TF841.3
- 【下载频次】215