节点文献

BO T项目融资风险管控路径的分析与探究

Analysis and Research on the Path of BOT Project Financing Risk Management and Control

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王琰琰; 者贵昌;

【Author】 WANG Yan-yan;ZHE Gui-chang;School of Economics and Management, Yunnan Normal University;

【通讯作者】 者贵昌;

【机构】 云南师范大学经济与管理学院;

【摘要】 随着我国经济的快速发展,着力加大公共基础设施建设力度是适应国情、应对我国人口增长的重要手段。公共基础设施建设必然需要巨大的资金支持,BOT融资项目通过民间集资、引入外资等多种方式,为解决巨额建设资金问题提供了一个新的方向。在我国改革开放的进程中,BOT融资在我国运行时间不长,所以经验不足,面临的风险较多。因此,在剖析BOT融资风险表现的基础上,探究风险管控的基本路径。

【Abstract】 With the rapid development of my country’s economy, it is an important means to adapt to the national conditions and to respond to my country’s population growth by increasing the intensity of public infrastructure construction. The construction of public infrastructure inevitably needs huge financial support. BOT financing projects provide a new direction for solving the problem of huge construction funds through various methods such as private fund-raising and introduction of foreign capital. In the process of my country’s reform and opening up, BOT financing has not been running for a long time in my country, lacking experience, and facing more risks. On the basis of analyzing the risk performance of BOT financing, the paper explores the basic path of risk management and control.

【关键词】 BOT; 项目融资; 风险控制;
【Key words】 BOT; project financing; risk control;
  • 【文献出处】 经济研究导刊 ,Economic Research Guide , 编辑部邮箱 ,2021年17期
  • 【分类号】F285
  • 【被引频次】1
  • 【下载频次】296
节点文献中: 

本文链接的文献网络图示:

本文的引文网络