节点文献

珠江三角洲水资源配置工程大直径深井关键施工技术

Key Construction Technology of Large Diameter Deep Well for Water Resources Allocation Project in Pearl River Delta

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 钟砥宁谭荣珊谢展望

【Author】 ZHONG Dining;TAN Rongshan;XIE Zhanwang;Guangdong No.2 Hydropower Engineering Co.,Ltd.;

【机构】 广东水电二局股份有限公司

【摘要】 珠江三角洲水资源配置工程A2标3号盾构井外径为35.9m,开挖深度达73.98m,采用地下连续墙和钢筋混凝土内衬墙联合支护。对地下连续墙施工抓铣组合工法、套铣接头工艺,液压破碎锤破岩技术以及内衬墙采用逆-顺结合作法等关键技术探究,经工程实践,形成了一套较完善的大深井施工技术,可供类似工程施工借鉴。

【Abstract】 The outer diameter of No.3 shield well in A2 bid of Pearl River Delta Water Resources Allocation Project is 35.9 m,and the excavation depth reaches 73.98 m.The underground continuous wall and reinforced concrete lining wall are used for joint support.The key technologies such as the combination method of grasping and milling in the construction of underground continuous wall,the process of sleeve milling joint,the rock breaking technology of hydraulic crushing hammer,and the inverse-shun combination method of lining wall are explored.Through engineering practice,a set of perfect construction technology of deep well has been formed,which can be used for reference in similar engineering construction.

【关键词】 输水隧洞盾构深井施工技术
【Key words】 convey tunnelshieldingwellconstruction technique
  • 【文献出处】 广东水利水电 ,Guangdong Water Resources and Hydropower , 编辑部邮箱 ,2021年12期
  • 【分类号】TV554
  • 【下载频次】53
节点文献中: 

本文链接的文献网络图示:

本文的引文网络