节点文献

丰满大坝重建工程泄洪兼导流洞渗透压力监测资料分析

Analysis on seepage pressure of spillway using as diversion tunnel in reconstruction of Fengman dam

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李作光

【Author】 LI Zuoguang;Fengman Hydropower Plant;

【机构】 丰满发电厂

【摘要】 对丰满大坝重建工程泄洪兼导流洞监测项目进行了介绍。为判断泄洪兼导流洞渗透压力的变化情况,首先对监测数据进行可靠性检查,然后绘制时空分布曲线和建立统计模型,对渗透压力物理量进行定性和定量分析,得出泄洪兼导流洞渗透压力基本稳定的结论。

【Abstract】 Monitoring items for spillway which is also used as diversion tunnel in reconstruction of Fengman dam are introduced. In order to study the change of seepage pressure of spillway, the reliability of monitoring data is checked firstly, then the time-space distribution curve is drawn and the statistical model is established. By qualitative and quantitative analysis of seepage pressure, it is concluded that the seepage pressure of spillway is basically stable.

  • 【分类号】TV698.12
  • 【被引频次】1
  • 【下载频次】54
节点文献中: 

本文链接的文献网络图示:

本文的引文网络